Close Menu

Cephalosporin building

First was built applying European technologies and standards to produce a new generation of Cephalosporin with an estimated budget of 113 billion VND. WHO-GMP certified in 2010.

Was upgraded to EU-GMP standards in 2014.

Was granted an EU-GMP certification by the Health Ministry of Spain in 9/2016. The Health Ministry of Vietnam announced that in 11/2016.

Producing injectable powder and tablet products, 12 million bottles and 500 million units a year.

Product range:

  • Sterile: Powder for injection
  • Non-sterile: Hard capsule, Film-coated tablet, Sachet

  • Address: No.22, Street No. 2, VSIP II Industrial Zone, Hoa Phu Ward, Thu Dau Mot City, Binh Duong Province.
  • Phone: 0274 3815 166
  • Investment cost: 113,000,000,000 VND.
  • Capacity 12 million bottles and 500 million units a year.